Work at our house

Work at our house link

We had a tv camera at our house filming work in progress as part of an article on lead paint removal.  The contractors are working in our kitchen, the final shot is of the front of our house.  Click on the link to see the video.

Part of the challenge of the geothermal system was to coordinate with the kitchen renovation going on at the same time.  The Kitchen was "gutted" for the renovation.  This exposed plumbing and wiring to the 2nd floor bathroom above, which were added to the kitchen upgrade, along with the dining room ceiling.

Another challenge was that we are changing from hydronic radiators to a force air system.

I will deal with both of these renovations in a future post.