Thursday, July 8, 2010

Regrading



Our front lawn has been regraded. Piping was extended from the two geothermal wells into the house, coming into the basement about 4 feet below ground.

1 comment:

  1. How much did that cost, thats a large rig, two days at least.

    ReplyDelete