Top of Drill in Vertical Position
Bottom Of Drill with Mudguard
Well piping to be inserted into drilled well and grouted
35 ton drilling unit setting up
First well installed with tubing brought up above grade. Tubing and casing will be cut down to 4 feet below grade
After the second well was drilled. Mud is from the 300 foot wells, and water is from water encountered below ground while drilling